Skip to main content

Charles Folkard Mews (formerly Alderwood Road)

Latest updates

Contractors: A & E Elkins
Emergency contact details
Out of hours: 07432 054 504
1st Escalation Martin Cole: 07423 020 016
2nd Escalation Billy Mould: 07917 737 914

What we're thinking about building on this site

Six two-bedroom terrace homes, reduced from our initial plans for eight homes in response to feedback from local residents

Current status
Our new homes are now complete!
How can residents have their say on our plans?

We held a consultation meeting and online survey in September 2019, and amended our plans in response to resident feedback. The feedback we received at this meeting and via an online questionnaire were then taken into account as we created the designs which have now been given planning approval

Planning consent
Approved
Anticipated start date
Spring 2020
Planned completion date
Spring 2021
Images

Sustainability credentials

The following technologies have been incorporated into the design of our new homes to maximise sustainability and minimise environmental impact:

  • High efficiency air source heat pumps and hot water provision
  • Core material sourced from sustainable suppliers
  • High performance building fabric
  • Highly controlled factory manufacturing process ensures very high standard of workmanship
  • Triple glazing
  • Photovoltaic (solar panel) system to harness natural sunlight energy to generate electricity
  • Energy efficient lighting
  • Energy efficient cooling and ventilation system
This page was last updated on
06/09/22